Routes that have Loading Orders or All Changes locked will not have orders loaded onto them through Load Unloaded Orders. Route locks do not affect deleting or renaming routes.
In addition, the following actions will consider lock statuses:
- Dragging and dropping orders.
- Optimize Routes.
- Change Route Start Time (only considered if All Changes lock is enabled)
- Reschedule Route (only considered if All Changes lock is enabled)